![]() |
1. Material: SS 304
2. Inner polish: <=0.6um
3. ABB motor Sanitary fittings
4. Free train& install
5. Daily capacity: 3000L
3000l beer brewing equipment brewery machinery beer brew line
1. Introduction
ZD brewery equpiment is a good choice for ginshop, barbecue, small beer facory, restaurant who brew beer for customer at scene. Small floor coverage makes it possible to show consumers the whole process of beer brewing. The luxury and sanitary process comforts the consumers and give them impressed experience.
2 . Equipments Components
Equipments Request |
Components |
1. Milling System |
Malt Miller |
2. Mashing System |
Mash/Lauter Tun Boiler/Whirlpool Tun |
Hot liqutor tank |
|
Boiler |
|
Heat Exchanger |
|
Wort Pump |
|
Stir Device (Optional) |
|
Other Accessories are available: 1. Ornamental Pipe;2.Mashing Pipeline; 3. Operating Platform; 4. Yeast Feeder; 5. Venturi Tube; 6. Butterfly Valve DN40; 7. Butterfly Valve DN32; 8. Soft Pipe; 9. Dregs Rake; 10. Sugar Measuring Cylinder; 11. Saccharimeter; |
|
3. Fermenting System |
fermentation tank and Brite beer tank |
Other accessories are available: 1. L-Pipe; 2. Butterfly Valve; 3. Pressure Gage; 4. Solenoid Valve; 5. Vacuum Valve; 6. Cooling Pipe; 7. Thermal Insulation Pipe; |
|
4. Cooling System |
Ice Water Tank |
Refrigeration Machine |
|
Centrifugal Pump |
|
Evaporator |
|
Ice Water Pump |
|
Relative Pipes and Valves |
|
5. CIP System |
Washing Tank |
Sterilization Tank |
|
Pump and Valve |
|
6. Filter System |
Kieselguhr Filter |
Membrane Filter |
|
Filtered Beer Tanks |
|
7. Packing System |
Fresh Keg Packing Machine |
Pop Can Packing Machine |
|
Glass Bottle Packing Machine |
|
8. Controlling System |
Mashing Control Panel |
Fermenting Control Panel |
|
Refrigerating Control Panel |
3. Parameter of Various Models
Model Items |
ZD-1000 |
ZD-2000 |
ZD-3000 |
ZD-4000 |
ZD-5000 |
Capacity |
1000L/Day |
2000L/Day |
3000L/Day |
4000L/Day |
5000L/Day |
Area Request |
100M2 |
150M2 |
200M2 |
300M2 |
400M2 |
Installed Power |
15Kw |
20Kw |
25Kw |
35Kw |
40Kw |
Steam Request |
0.15Ton/Hr |
0.2Ton/Hr |
0.2Ton/Hr |
0.3Ton/Hr |
0.3Ton/Hr |
Water Consumption |
2M3/Day |
3M3/Day |
5M3/Day |
6M3/Day |
8M3/Day |
4. Guarantee & After Sales Service:
1) 24 hours on line and phone service.
2) 3 years warranty for main parts
3) Special design according to the plan drawing of the site customer provide
4). Engineer do free training for installation and operation, free technical support at your site.
5). English version manual and operation video CD disk.
6). Wholelife maintance service.
5. Production Pictures of Detailed
6. How to order?
If you are interested in brewery equipment, please advise us your requirement, so that we can select the suitable model with configuration and submit quotation accordingly.
1) Pls advise the daily beer production capacity(Liter/day)
2) Pls advise site dimension(Length, width and height)
3) The 3 phases power (V and HZ)
4) The types of beer you will make
5) You will build a beer factory or set up the equipment in a bar, hotel or restaurant.
Please feel free to let me know if you have any questions.
7. Pics of visitors
8. Pics for packing and shipping
Processing: |
Fermenting Equipment,argon arc welding
|
Condition: |
New
|
Place of Origin: |
Shandong China (Mainland)
|
Brand Name: |
ZD
|
Model Number: |
ZD-2000
|
Processing Types: |
BEER
|
Voltage: |
accordind to customer's local situtaion
|
Power(W): |
35kw
|
Dimension(L*W*H): |
1660*1660*3500mm
|
Weight: |
5T
|
Certification: |
CE
|
Warranty: |
3 years
|
After-sales Service Provided: |
Engineers available to service machinery overseas
|
Material: |
SS 304
|
Processing method: |
argon arc welding
|
Cooling jacket: |
dimple plate
|
Heating: |
direct fire or steam
|
Manhole: |
top or side
|
Polish: |
<=0.6um
|
Connect: |
tri clamp
|
Shape: |
conical
|
Cold water: |
glycol
|
Fitting: |
sanitary grade
|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |